0 ratings
Aqua Pro 69717 9 12 Long Magnesium Anode Rod with 34 Male Pipe Thread
Protect your water heater from corrosion with the Aqua Pro 69717 lead-free magnesium anode rod.
Aqua Pro 69717 9 12 Long Magnesium Anode Rod with 34 Male Pipe Thread
Item #: 18221184

Aqua Pro 69717 9 12 Long Magnesium Anode Rod with 34 Male Pipe Thread

Item #: 18221184

TRY 1126

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Tuesday, August 11
Our Top Logistics Partners
  • fedex
  • dhl
Protect your water heater from corrosion with the Aqua Pro 69717 lead-free magnesium anode rod.
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
american express payment
ptt group payment
turkiye-bankasi payment
garanti bbva payment
akbank payment
yapi kredi payment
denizbank payment
kuveyt turk payment
vakifbank payment
ziraat bankasi payment
teb payment
sekerbank payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

What Stands Out

Corrosion Resistance
Made from high-quality magnesium, this anode rod effectively prevents corrosion in water heaters, prolonging their lifespan and ensuring optimal performance.
Universal Fit
Designed with a 3/4" male pipe thread, this anode rod easily connects to various water heater models, offering versatility for homeowners and technicians alike.
Extended Lifespan
The Aqua Pro 69717 significantly reduces sediment buildup, enhancing the efficiency of your water heater and saving on energy costs by maintaining consistent heating performance.

Product Details

Get high-quality Aqua Pro 69717 Magnesium Anode Rod with 3/4 Male Pipe Thread at Ubuy Turkey. Say goodbye to lead with this long-lasting rod.
  • Lead-free Aqua Pro 69717 magnesium anode rod
  • Suitable for suburban and MorFlo water heaters
  • Measures 9 inches in length
  • Features a 3/4 inch male pipe thread
  • Comes in bulk packaging for convenience
  • Helps prevent corrosion in water heaters
Item Weight1.2 lbs (540 grams)

Who Should Buy?

Suitable For
  • Water Heater Owners

    Ideal for users wanting to extend the life of their water heater by preventing corrosion.

  • DIY Enthusiasts

    Perfect for those who enjoy home maintenance projects and prefer replacing anode rods themselves.

  • Eco-Conscious Users

    Suitable for environmentally friendly individuals looking to reduce their overall utility costs over time.

Not Suitable For
  • Professional Installers

    Not recommended for those who require heavier and more durable commercial-grade anode rods for extensive applications.

Product Description

Aqua Pro 69717 9 12 Long Magnesium Anode Rod with 34 Male Pipe Thread

About This Item

Introducing the Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread - the ultimate solution for protecting your water heater from corrosion and extending its lifespan. Crafted with high-quality lead free magnesium, this anode rod works tirelessly to prevent the build-up of rust and scale inside your water heater tank, ensuring efficient performance and optimal water quality. The 9 1/2" length of this anode rod is designed to fit most standard water heaters, providing maximum coverage and protection.

With a 3/4" male pipe thread, installation is a breeze and you can start enjoying the benefits in no time. Not only does this anode rod effectively safeguard your water heater, but it is also an environmentally friendly option. As it is lead-free, you can have peace of mind knowing that your water supply remains safe and free from harmful contaminants.

Ideal for both residential and commercial applications, the Aqua Pro 69717 Magnesium Anode Rod is a reliable choice for both new installations and replacements. Its durability and longevity make it a cost-effective investment that will save you time and money in the long run. Don't wait until it's too late - protect your water heater with the Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread.

Trust in Aqua Pro, the industry leader in water treatment solutions, to deliver exceptional performance and quality. Upgrade your water heater today and experience the difference!.

Have any Query? Chat with us

Customer Questions & Answers

  • Question: What is the Aqua Pro 69717 9 12 Long Magnesium Anode Rod used for?

    Answer: The Aqua Pro 69717 long magnesium anode rod is designed to prevent corrosion in water heaters. It works by attracting corrosive elements present in the water, which helps protect the inner tank from rust and extend the life of the water heater. This rod is essential for those looking to maintain their hot water systems and avoid costly replacements. For instance, if you live in an area with hard water, using this magnesium anode can significantly reduce the rusting process, ensuring your water heater operates efficiently.
  • Question: How do I install the Aqua Pro 69717 Magnesium Anode Rod?

    Answer: Installing the Aqua Pro 69717 anode rod is a straightforward process. First, you will need to drain some water from your water heater to relieve pressure. Next, locate the anode rod port, typically at the top of the unit, and remove any old anode using a wrench. Then, simply screw in the new magnesium anode rod using the 3/4 male pipe thread until secure. This installation can significantly enhance the longevity of your heater, especially if done regularly as part of maintenance. Always ensure to check your water heater’s manual for specific installation instructions.
  • Question: What are the benefits of using a magnesium anode rod over other materials?

    Answer: Magnesium anode rods such as the Aqua Pro 69717 are preferred by many homeowners because they are more effective at combating corrosion compared to aluminum or zinc rods. Magnesium provides superior cathodic protection, meaning it can better prevent rust formation, thereby prolonging the life of your water heater. This is particularly beneficial in regions with high water mineral content. By investing in a magnesium rod, you can significantly reduce the risk of damage from corrosion, leading to a more reliable hot water supply.
  • Question: How often should I replace the Aqua Pro Magnesium Anode Rod?

    Answer: It is advised to check your Aqua Pro magnesium anode rod annually, and replace it every 3 to 5 years, depending on water quality and usage. Factors such as water hardness and temperature can affect the longevity of the rod. If you notice a significant decrease in water heater efficiency or find corrosion or discoloration, it’s time for a replacement. Regular checks not only ensure optimal performance but also save you from expensive repairs due to corrosion damage.
  • Question: Is the Aqua Pro 69717 suitable for all types of water heaters?

    Answer: The Aqua Pro 69717 magnesium anode rod is compatible with a variety of water heater types, including gas and electric models. However, it’s essential to verify that your water heater has the right fitting for the 3/4 male pipe thread before purchase. Utilizing this rod in compatible units can enhance protection against corrosion, especially in older water heaters. If you're unsure about compatibility, consult your water heater's manual or a professional for guidance.
  • Question: What makes the Aqua Pro 69717 different from other anode rods?

    Answer: The Aqua Pro 69717 distinguishes itself with its long magnesium construction, designed specifically to offer robust corrosion protection for extended periods. Unlike many other anode rods that may use zinc or aluminum, this magnesium rod enhances performance by better forgoing electrolytic action, ensuring a longer lifespan for your water heater. It is particularly advantageous for those living in areas with hard water, where conventional rods may not provide sufficient protection. This makes the Aqua Pro 69717 a preferred choice for homeowners focused on durability.
  • Question: How can I tell if my anode rod needs replacement?

    Answer: Signs that your Aqua Pro magnesium anode rod needs replacement include a decrease in hot water heater efficiency, a rotten egg smell in water, or visible corrosion on the rod itself. Additionally, if you notice rust in your hot water or suspect sediment buildup, it’s a good idea to check the anode rod. Regular inspection helps maintain both your water heater's efficiency and your water quality. If the rod is significantly diminished (less than 1/2 inch thick), it's time to replace it to avoid further damage.
  • Question: Can I use an anode rod in a tankless water heater?

    Answer: Anode rods are generally not used in tankless water heaters as these systems are designed to heat water on-demand and do not have the same corrosion concerns as traditional storage tanks. However, maintaining your tankless water heater involves regular flushing to avoid mineral buildup. If you are uncertain, consult the manufacturer’s instructions or a professional technician. While this might not be a concern for tankless units, ensuring overall maintenance is key to performance longevity.
  • Question: What should I do if my water heater smells like rotten eggs?

    Answer: A rotten egg smell often indicates the presence of hydrogen sulfide, which can occur as a reaction with certain water heater anode rods. If you detect this odor, especially in stored hot water, it may be time to check or replace your Aqua Pro magnesium anode rod. Since hydrogen sulfide can be corrosive and affect both the taste and safety of the water, it's imperative to address the issue promptly. Switching to a magnesium anode rod could mitigate the smell and improve water quality.
  • Question: Where can I buy the Aqua Pro 69717 9 12 Long Magnesium Anode Rod?

    Answer: You can purchase the Aqua Pro 69717 9 12 Long Magnesium Anode Rod from Ubuy. They offer a convenient online shopping experience, allowing you to find your desired product easily and securely. Ubuy provides access to international delivery along with a wide range of home improvement products, making it an excellent choice for your anode rod needs in Turkey.

Aquapro Pipe Fittings Editorial Review

No editorial reviews found

Customer Reviews & Ratings

5.0
1 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Platform Trust & Buyer Confidence

trustpilot logo
4.3/5 9200 + reviews
Read reviews
MA
Mohammad
Verified buyer

“Excellent quality and original too,when ubuy send original things I will appreciate that ,I very satisfied thank you”

23 July 2026 · via Trustpilot
CK
Chitra
Verified buyer

“The order and delivery progress was communicated very well. Package arrived within the estimated time. Products arrived as expected in good condition.”

22-Jul-26 · via Trustpilot
K
kund
Verified buyer

“Good supply of products. Safe payment methods, and shipment worldwide! Genuine products.”

23-Jul-26 · via Trustpilot
OO
Onesi
Verified buyer

“Was my first time buying a product from Ubuy, but I found it so helpful. This is reliable. Gonna place a new order!”

22 July 2026 · via Trustpilot
SJ
SAO JOHN
Verified buyer

“Ubuy is a great online platform to buy stuff. Reliable, fast delivery time and great value for money. I've been using Ubuy online shopping platform for three years now and will continue to do so.”

23 July 2026 · via Trustpilot
Secure Checkout Global Delivery Easy Returns Genuine Products

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.